SHENZHEN MEAN WELL DA ELECTRONICS CO .,LTD. 中文英文
Service
The current position:Home >> Service >> Construction Process

CONSTRUCTION PROCESS

LED Module

1.LED lamp

2.PCB circuit board

3.driver IC

4.resistance

5.plastic components

6.electric capacity

Construction Program Design

1.Installation structure design

2.Wiring installation  design

3.Air conditioning engineering design

4.Control room design

5.Power Distribution Design

6.Engineering drawing design

7.Construction site layout

8.Equipment approach

9.Temporary water supply power solution

LED display accessories

1.Computer

2.Electric closet

3.Video processor

4.Function card

5.Lightning rod

6.Industrial Air conditioner

7.Special power source

8.Sound effect

LED display accessory material

1.The technician will provide site-investigation after arriving at the engineering installation site

2.Confirm the installation site and the surroundings of the LED display

3.Confirm the machine room location、surroundings、control distance of the machine room

4.Measure the actual transmission distance of the control signal and the data signal